A595 Campaign
This weekend I have been canvassing in the Holmrook area. I was not surprised to find strong opposition to the idea of De-Trunking the A595.
This road is the only effective way to reach a large area of Cumbria. It is the only road access to an important national facility - the Nuclear Waster repository at Drigg. It is the main route from a large part of Copeland to the most accessible District General Hospital, currently at Whitehaven. (That argument will be even stronger if the hospital is moved.)
The relevant Health And Safety authorities have also advised that we need evacuation routes to both North and South from Sellafield. The only possible evacuation route to the South is the A595.
In my view, and that of every local resident with whom I have discussed it, the arguments to keep trunk status for this road and indeed improve it are overwhelming. I will be attending the Public Inquiru next month with local County Councillor Sue Brown to make this point.
This road is the only effective way to reach a large area of Cumbria. It is the only road access to an important national facility - the Nuclear Waster repository at Drigg. It is the main route from a large part of Copeland to the most accessible District General Hospital, currently at Whitehaven. (That argument will be even stronger if the hospital is moved.)
The relevant Health And Safety authorities have also advised that we need evacuation routes to both North and South from Sellafield. The only possible evacuation route to the South is the A595.
In my view, and that of every local resident with whom I have discussed it, the arguments to keep trunk status for this road and indeed improve it are overwhelming. I will be attending the Public Inquiru next month with local County Councillor Sue Brown to make this point.